Tuesday, January 28, 2020

The Present Work of Christ in Hebrews Essay Example for Free

The Present Work of Christ in Hebrews Essay David McLeod has written this journal article in large part in response to a number of writers who have charged that the present work of Christ has largely â€Å"been neglected† [1] by systematic theologians of the church today. In McLeod’s estimation such neglect would not be understood by the New Testament authors, as Christ’s present work was one of their most important themes in the New Testament. McLeod states that, â€Å"The purpose of this article is to examine the work of one of those authors, the epistle to the Hebrews, and to outline its contribution to the subject. †[2] McLeod gives three reasons for his study. First, no theme that was central to apostolic Christianity can be overlooked, second, added attention needs to be directed to earlier studies in Hebrews and finally, McLeod’s hope is that material covered in this article will aid those who teach and study the Bible to be more fully informed about the subject of the work of Christ in the Epistle to the Hebrews. Commencement of Christ’s Present Ministry With the purpose of this article being to examine the work of the New Testament author of Hebrews intent, and outline said New Testament’s author’s work regarding the work of Christ, McLeod does so two fold. First, McLeod addresses the Commencement of Christ’s Present Ministry, and secondly the Activities of His Present Ministry. The commencement of Christ’s present ministry begins with His ascension which â€Å"is one of a series of events that marked the beginning of Christs present ministry. †[3] With His ascension Christ entered into the sanctuary where He took up His place of honor in the holy of holies. This place of honor was at the right hand of the father, where Christ was exalted and rested from His completed work. It was at this point that Christ was installed as High Priest and given His present ministry. McLeod writes that, â€Å"The Son of God has obtained a more excellent ministry than that of the Levitical priests who served the earthly tabernacle (8:5-6). †[4] †The perfect tense suggests not only that Jesus obtained this ministry in the past but also that He still possesses it†. [5] Once Christ obtained His ministry, the text in Hebrews suggests that this ministry is still in Christ’s possession and that it continues. Activities of Christ’s Present Ministry The activities of Christ’s present ministry are six fold. As the High Priest of mankind, one of Christ’s present ministries is to stand before God and represent those who have accepted His sacrifice. Representation can be thought of in McLeod’s opinion as Christ being in the immediate presence of God†,[6] representing â€Å"sinners on the basis of a finished sacrifice whereby they have acceptance with God and are favorably regarded by Him. [7] Inauguration, the second of Christ’s activities is to provide a new and living way to commune with God that never grows obsolete. Intercession, is defined by McLeod as, â€Å" the sympathetic appeals and petitions of the ascended, incarnate Son of God to God the Father (on the basis of a finished sacrifice) for the preservation, forgiveness, renovation, and bringing to glory of His people. †[8] Mediation is the activity where Christ mediated His followers p rayers and praise as well, being the medium for the power of God to be released upon His people. Anticipation as defined by McLeod represents â€Å"that quiescent activity of Christ whereby He awaits His return (1:6; 9:28; 10:37), the defeat of His enemies (1:13; 10:13), and His rule as King (1:8-9) over the world to come (2:5). †[9] Benediction is the final of the six activities outlined by McLeod. McLeod denotes that Benediction is â€Å"Christs work of benediction in Hebrews, His future return to His people from His heavenly sanctuary and the fulfillment of the promise†[10] Critical Evaluation McLeod’s argument is centered on the claim that today’s church and systematic theologian’s attention to the present work of Christ has largely â€Å"been neglected†. [11]McLeod’s aim is to examine the book of Hebrews and by doing so reiterate the importance that no theme of the apostolic writings should be neglected; he also wishes to draw further attention to the book of Hebrews and its estimation of the present work of Christ. McLeod’s division in this article outlines the commencement of Christ’s Present Ministry, and secondly the Activities of His Present Ministry. McLeod makes a sound argument for the commencement of Christ’s present ministry. Touching on the end of His earthly ministry, with His ascension, and His installment as High Priest in the holy of holies. McLeod’s evaluation of Christ’s present ministry is just as compelling and does well in addressing the many scholarly views pertaining to the present ministry of Christ. McLeod states that, â€Å"The author of Hebrews wrote of a number of activities presently being performed by Christ as High Priest. Scholars differ over the number of distinct activities and their nature. †[12] In regard to intercession McLeod brings the reader through many views that are held in regard to the present ministry of Christ and seems to amplify that this present ministry of Christ is of the utmost importance to grasp and understand. Conclusion Overall, McLeod has successfully accomplished of his goal of bringing added attention to the present work of Christ and outline the timeline of when His present ministry began. His arguments are sound and thorough, leaving little to question. While reading this article the reader will be brought methodically and precisely through the work of Christ’s present ministry, and in so doing accomplish the goal of the author to provide material that will aid and instruct Bible students who teach and write on Christology.

Monday, January 20, 2020

Citizen Kane Essays -- essays research papers

The film Citizen Kane, directed by Orson Welles, is a great example of how a man can be corrupted by wealth. Through the characters in the film we can observe how Charles Foster Kane, an idealistic man with principles, can be changed and misguided by wealth and what accompanies wealth. The film takes places during the late 19th century and early 20th century, a time in American history when the world is changing and wealth is a great power to change it with. Through the story telling of Kane’s life we are able to see how wealth changes, not only Kane’s ideals, but his actions and how he perceives the world.   Ã‚  Ã‚  Ã‚  Ã‚  The corruption of idealism by wealth can be seen throughout the film, especially through the thoughts and actions of Kane and the other characters. For example, when Kane publishes his first newspaper for the Inquirer he prints his â€Å"Declaration of Principles†. Jebediah Leland remarks at that time that he would like to keep it because he feels that it will be an important document one day. As Kane becomes more wealthy and more corrupt by his wealth, Leeland returns the document and we see that Kane understands that he is no longer the same man he was before or the man he set out to become. From this we also see that Leeland and the other characters in the film have come to the same conclusion. Furthermore, in the film, Kane states more than once, that people will think or do whatever he wishes them. Kane, with his wealth, tries to create his i...

Sunday, January 12, 2020

Project Plan- Risk and Quality Requirements Essay

IT Project Plan IT projects are complex in nature. A proper plan gives not only maps the elements of the project but also ensures that the progress of project is going in the desired direction. In other terms, a project plan reduces the risk of project failure or over runs and improves the quality of the project. Project plan is the initial step in executing the project management. Project management strives to meet the expectations of the project stakeholders in terms of cost, quality, delivery and operations.   Project management is a crucial process that involves, people, process, price, infrastructure and cost. Project management should balance the interests of different stakeholders of the project like Project team members, management of the working group, client parameters, industry practices and the budget restrictions. In IT industry, it becomes the responsibility of project manager to look after the co-ordination of the above aspects. Project plan becomes an essential helping tool to the project management in directing the project requirements to the people and system. The project plan aligns the activities with the project life cycle and gives visibility to different phases of the project. IT will be like indicating the stakeholders of the project like client and project team to act upon the different activities of the project like, development, testing, rollout, training and implementation. The project plan is developed in connection with Organizational plan, Risk plan, Cost plan, Test plan, Roll out plan, Quality plan, Maintenance plan etc., So it is evident that Risk identification and Quality parameters act as forecasters for the project phase activities and does have a great significance in the successful implementation. However project plan includes the The Project Plan provides complete overview on how and when a project’s objectives are to be achieved, by expressing different activities to resources to achieve targets at different milestones The major elements of the project plan are as following: Description of the project or an over view of the project plan. Project specifications and requirements of the client Project Initiation plan and requirements in terms of technology, budget and people Project dependencies- external, internal Project milestones like Analysis, design, development, testing, implementation and training Identification and specification of project assumptions like availability of resources, technical inputs, skills and competency requirements. Project plan with work break down structure through Gantt chart or bar chart and control points at different levels. Project level activity specifications for different stakeholders like client team,, analysis team, design team etc., Project level resource specifications Project budget and cost plan Project tolerance, through put and capacity in terms of users and boundaries Technology to be implemented with constrains and rationale for the usage. Network contingency plans and infrastructure layout plans to be required for the project work out Risk identification and risk tolerance specifications of he system Quality framework under which the project is expected to execute Risk Risk can be termed as the possible loss or damage to a process. Risk identification is the estimation of possible potential dangers that can occur or hinder the progress of the project.   Risk in IT project management is a major component to consider even before the project execution, as the unidentified risks not only obstruct the progress but also may turn the entire project into loss. A risk will have a probability something above 0%.   And there is an identified chance to happen, which other wise is not a risk. So a deliberate approach to identify and mitigate the risks is highly appreciable from the project learning from decades. According to Dr. Barry W. Boehm, (as cited in kjordan) the top 10 identified software risks are as follows: Personal Shortfalls in perception of risk and resources Unrealistic schedules and budgets Developing the wrong functions and properties Developing the wrong user interface Gold-plating Continuing stream of requirements changes Shortfalls in externally furnished components Shortfalls in externally performed tasks Real-time performance shortfalls Straining computer-science capabilities So, IT projects do have a risk management process that is expressed through the risk management plan. The risk management plan contains the four major areas to observe in the plan: Risk Identification: The project manager or risk management personnel will identify the possible potential threats to the project management before well in advance. Eg; Shortage of workforce due to the withdrawal of people from the team; this can be from different reasons like, maternity leave, transfers to other projects or contract termination etc., Risk Quantification: The risk identified should be quantifiable, other wise which it is will not be of much useful. Eg; What percentage of people are going to be placed on another major project or percentage of testers that may not be available on project A. Risk Response: The consequences of risk should be specified, in the sense, sometimes the system may be less altered with certain types of risks. With this, the low response of system indicates and attributes the risk as a less priority risk. And the risks that may cause major alterations to the process will be given high priority by the project plan to address them and mitigate them. Risk Monitoring and Control: Risk monitoring and controlling involves the risk mitigation tools and practices for the easy execution of the project. Eg: Training the new people to fill the gaps on attrition by the time they leave or to be transferred from the current project process. The common risk scenarios in IT projects are as follows: Schedule Risk This is the highly possible risks in IT projects, when projects over run with scheduled times or slip the release schedules or the client priorities and queries are not answered Schedule risks alters the project phases and disturbs many dependencies. Other project dependencies like testing schedules, release schedules and infrastructure costing etc., can be altered and result in excessive costing and   losses. Schedule risk can happened due to the following reasons: Inappropriate or wrong project time estimation Poor tracking and monitoring of work break down plan with the resources. Over estimation of system functionality and through put. Eg: When the existing system support only 50 resources to work, scheduling of 60 or 65 may result in non availability of proper infrastructure. Wrong estimation of effort or skills. Eg: the project with low skilled work force or low effort estimation may take much time compared with the scenario of experienced people on task. Failure to specify or identify complex functionalities or requirements that emerge and become stumbling blocks for the progress execution, takes longer time to resolve and them to continue with the projected phases. Unexpected project scope expansions: These can happen due to the poor business analysis and feasibility guidelines. Budget Risk All the above schedule risks can ultimately result in increase in resource cost. In addition to this, the following at the initial project plan phase also result in budget risks Wrong budget estimation: When the cost of resources is going to be increased in future, adaptation of old compensation rates will ask for more funds to meet the project execution after some time. Cost overruns: These will arise when the project activities are not aligning with the planned activities Project scope expansion: Wrong specification of requirement may lead to extra budgets.   Ã‚  Ã‚  Ã‚  Ã‚   Eg:   Some IT projects fail to define the project scope very specifically in terms of design,   Ã‚  Ã‚  Ã‚  Ã‚   development, training (on site), installation, maintenance, and support. A project that fails   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   to differentiate between on site training support and training support through   Ã‚  Ã‚   documentation like user guide and admin guide has to face a situation in which the   Ã‚  Ã‚  Ã‚  Ã‚   company has to bear the traveling and expenses of training resource when on-site training   Ã‚  Ã‚  Ã‚  Ã‚   is demanded in the last moment. Operational Risks Operational risks arises due to non specification of appropriate project methodology and non implementation of project processes like daily meetings (scrums), communication reports, Change requirement reports. Such risks will again result in over runs in operational schedules and results in high costs. Some causes of Operational risks are as follows: Failure to address priority conflicts: when tasks and conflicts are not nor prioritized, people sit on unnecessary or low priority tasks resulting the operational delays. Failure to resolve the responsibilities: The non-defined roles and responsibilities work on the similar operations or raise conflicts at some point of time in the operations. Insufficient resources : A project with in sufficient resources may execute poor operational performance and may result in operational delay.   No proper subject training : When the project stakeholders are not given project training at consecutive levels, there will be no direction and clarity in the project operations.   No resource planning : If the resource allocation is not properly planned, conflict arises between the different activities of the system   No communication in team: poor communication is the major hindrance for smooth project execution. Excessive communication and less communication will also alter the project schedules. Non -defining the desired level and form of communication hampers the information flow . eg: Non-maintenance of Change request forms from the client may result in wastage of work on the old configuration of modules by the developers and may result in project over runs. Technical risks Technical risks are the most unidentified risks with great damage and result in failure of functionality and performance. The causes of technical risks are: Continuous changing requirements: The initial technical specifications may require different technology platform to the technology that is appropriate for the recently added requirements Poor suggestion of technology: Lack of technical expertise of resources may result in compatibility problems. Some advanced features that may not be ready by the time of release, or that may not be compatible with the already developed functionalities will hamper the project execution. Product is complex to implement: When the product development is too complex and there is a dearth of skill and expertise in the market, the project needs to suffer delay or failure. Difficult project modules integration: When different modules are products are to be integrated, incompatibility problem arises between them that result in re work or failure. External Risks    These are the external risks beyond the boundaries of project management. These are all uncertain and may result of the following: Shortage of fund. Market Changes: Transferred demand Changing customer product strategy and priority Government rule changes. Quality Requirements of Project Quality refers to the delivery of projects and products that meet the expectations of all the stakeholders. A project that may meet all the specification of the client, but may over run the project schedule is not termed as a quality project, as it has resulted in extra cost to the management. So in order to bring down the risk, IT projects adopt different Quality models. For example Software design and development projects adopt quality models like CMMI, ISO, BSI, etc., he quality model frames a risk management plan and ensures the system to adhere to the planned project activities until the successful implementation. Usually the quality models identify some risk areas and constantly work on controlling the risk areas. The parameters that are commonly observed by different Quality models for IT systems are as follows: Correctness, Reliability, Integrity, Usability, Efficiency, Maintainability, Testability, Interoperability, Flexibility, Reusability, Portability, Clarity, Modifiability, Documentation, Schedule, Validity, Functionality, Generality and Economy. The quality management department or manager will ensure the project that it is being executed properly as per the plan. All the stakeholders monitor the project activities according to the quality parameters and control the error or risk as per the risk mitigation guidelines. Project Quality Plan defines the expectation of the stakeholders in terms of project specifications, schedule time, technology inputs, dependencies etc., and also maps the process to ensure the system to balance. A Project Quality management supports the following through quality plans and system guidelines: Defining organizational and project level quality objectives and parameters Customer requirements and expectations in terms of functionality, delivery Acceptance criteria of the IT product, which is a prioritized list of criteria for the customer to accept the final product. Roles and responsibilities of Quality management team. Functionality boundaries of the project quality system Reference to Industry practices or standards to be met The quality-control and audit processes to be applied to project management Quality-control and audit process parameters and requirements Change management procedures in case of scope change in project Configuration management plan Validation and verification controls Quality control and Assurance plan and procedures By adopting quality monitoring procedures Defining test lab procedures like- test documentation, testing resources, Test cases, scenarios, error logs and other testing documentation Metrics for quality analysis System guidelines for quality management procedures Maintenance of configuration management and change control requirements Conclusion For the Successful IT Project implementation, the project plan must address the risk issues and Quality requirements to mitigate the risk issues. Effective project planning, quality control, and monitoring will ensure the quality assurance of the project mitigating the identified risks. References Elizabeth and Richard Larson, How to Create a Clear Project Plan, Retrieved February 2,   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   2008 from www.projectmanagement.ittoolbox.com/documents/industry-articles/how-to–  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   create-a-clear-project-plan-844 – 26k – EPA Requirements for Quality Assurance Project Plans (EPA QA/R-5), Retrieved February   Ã‚  Ã‚  Ã‚   2, 2008 from http://www.epa.gov/QUALITY/qs-docs/r5-final.pdf kjordan, Introduction to Software Risk & Risk Management, Retrieved February 2,2008   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   from   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://baz.com/kjordan/swse625/intro.html Hyatt & L. Rosenberg, A Software Quality Model and Metrics for Identifying Project Risks and Assessing Software Quality, http://satc.gsfc.nasa.gov/support/STC_APR96/qualtiy/stc_qual.html Project Management Planning, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://www.cio.ca.gov/itpolicy/pdf/PM3.2_Planning_Process_and_Plan.pdf Project Quality Plan , Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://www.ogc.gov.uk/documentation_and_templates_project_quality_plan.asp Project plan, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚   http://www.ogc.gov.uk/documentation_and_templates_project_plan_.asp QUALITY ASSURANCE PROJECT PLAN REQUIREMENTS, Retrieved February 2,   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   2008   Ã‚   from     Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://www.wipp.energy.gov/library/CRA/BaselineTool/Documents/Appendices/  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   WAP%  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   2010.PDF Quality Assurance Planning, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://www.chesapeakebay.net/info/qa_planning.cfm Risk management strategy, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://www.ogc.gov.uk/documentation_and_templates_risk_management_strateg  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   y_.asp Risk management framework, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   http://www.ogc.gov.uk/documentation_and_templates_risk_management_framew  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   ork_.as p Risk management strategy, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚   http://www.ogc.gov.uk/documentation_and_templates_risk_management_strateg  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚  Ã‚   y_.asp Risk log (risk register) Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚   http://www.ogc.gov.uk/documentation_and_templates_risk_log_risk_register.asp Types of Risks in Software Projects, Retrieved February 2, 2008 from   Ã‚  Ã‚  Ã‚  Ã‚   http://www.softwaretestinghelp.com/types-of-risks-in-software-projects/   

Saturday, January 4, 2020

Finance, Economics, And Finance Essay - 1245 Words

Statement of Purpose As a child, I often accompanied my uncle to the stock market. Looking at the share index numbers on the large overhead screen, I was fascinated with this world. As I grew up, I gradually came to appreciate the importance of financial sector in the modern world. In the university, I was fortunate to have been exposed to many interesting and challenging fields. Though I ultimately chose to major in Accounting, I also studied business, management, economics, and finance. These courses impressed upon me the importance of the financial sector in the economy. Finance professionals have the unique responsibility of managing assets and analyzing risks to ensure the future success of a company or organization. It is difficult to overstate the importance of this role, as the financial crisis of 2009 showed. It is due to my understanding of the importance of finance and investment, coupled with my longstanding interest for this subject, that I have decided to pursue postgraduate studies in fina nce at your prestigious university. Earning a master’s degree in finance would ideally complement my undergraduate degree in accounting. My background in accounting provides me with fundamental knowledge of many finance-related theories and concepts, as well as familiarity with statistics and data analysis. I learned the basic tenets of finance in courses such as Economics, Management, Accounting and Corporate Finance. Through case studies and lectures, I broadened myShow MoreRelatedFinance Is Based On Economics841 Words   |  4 PagesFinance is based on economics. Therefore, to properly understand financial markets and their behavior, you must first understand economics. Economics is the concern of production, distribution, trade and consumption of goods and services. It is the science that arises out of the relationship between limited resources and unlimited wants and needs by humans. Macroeconomics started with John Maynard Keynes, an English economist, who published a book entitled General Theory of Employment, InterestRead MoreThe Theory Of Economics And Finance1941 Words   |  8 PagesEconomics As the DIMEFIL paradigm defines economics and finance as two different fronts on which to battle terrorism, I will begin by defining the terms. The Economy of terrorism is to be considered on a local or interpersonal level; what are the ground level activities which finance terrorism, and who are the individuals who take part? The question must also be asked, what can be done to reintegrate these individuals into the country s larger economic infrastructure? Economic integration isRead MoreQuestions On Economics And Finance2149 Words   |  9 Pages ECON1009 – INTRODUCTORY ECONOMICS AND FINANCE SP2, 2016 Answer ALL the questions, as listed below, following the instructions provided in the Course Outline (Assessment #3 - Take Home Examination, pages 9-10). QUESTION 1 Using appropriate diagrams, discuss how an increase or an improvement in the following non-price determinants of supply would change equilibrium prices and quantities. (a) Technology, (b) Input/resource prices, (c) Taxes and subsidies, and (d) Expectations of producers. (4*5=20Read MoreA Research Study On Finance And Economics2006 Words   |  9 PagesTwo years ago while I offered a research job at Cambridge in applied economics, one of my friends jokingly quipped that one day I would be the next Raghuram Rajan, who had just taken over as the Governor of the Reserve Bank of India following his academic position. I smiled as I had then not considered the possibility of becoming an academic who could wield such power in designing policies to govern the financial institution of the world s largest democracy. In retrospect, this does not seem veryRead MoreEconomics Of Corporate Finance Theory1214 Words   |  5 PagesEconomics of Corporate Finance Capital Asset Pricing Model is the foundation stone of modern finance theory. It reveals the basic operation rules of the capital market and it is important in market practice and theory research(). By use of this model, the relation between risk and expected return is accurately predicted, and provides a method to estimate the yield of potential investment projects and help us to predict the expected rate of return of market in future. Although the Capital Asset PricingRead MoreThe Role of Finance in Economics Essay1343 Words   |  6 PagesThe Role of Finance in Economics No Works Cited Finance is a branch of economics concerned with providing funds to individuals, businesses, and governments. Finance allows these entities to use credit instead of cash to purchase goods and invest in projects. For example, an individual can borrow money from a bank to buy a home or an industrial firm can raise money through investors to build a new factory. Governments can issue bonds to raise money for projects. Finance plays an important roleRead MorePersonal Economics : Personal Finance1049 Words   |  5 PagesThe goal of this course is to get you thinking about personal finance issues at a point in your life when you still have time to benefit from the power of time in generating wealth to accomplish your other life goals. The financial decisions you make early in life with determine in great extent the quality of life you will enjoy later, especially given the turbulent and uncertain economic conditions. Money isn’t everything, but a lack of it will impact almost every aspect of your life and thoseRead MoreEconomic And Financial Forces Of Finance And Business1536 Words   |  7 Pages2015 I emailed professor Kumar about potential research options in the Economics department. I wanted to focus on a topic that was tailored to my interests in finance and business, but I also wanted to concentrate on a topic that included studying the dynamic energies of business cycles and broa der economic movements. Moreover, I wanted something specific, yet comprehensive, that would allow me to study a full range of economic and financial forces in an interesting and significant field. ProfessorRead MoreLinear Programming in Finance, Accounting and Economics3078 Words   |  13 PagesLinear Programming in Finance, Accounting and Economics Sijia Lu 7289928683 Abstract This article is literatures review about five articles, which apply linear programming to Finance, accounting and economics. The mathematical method is found of crucial importance in those fields. The paper shows how theoretical inference in linear programming throws light upon realistic practice, and how empirical evidence supports those theories. Keywords: finance; accounting; economics; linear programming; investmentRead MoreEconomics: Briefing on Different Concepts in Finance592 Words   |  2 Pagesï » ¿ Economics: Briefing on different concepts in finance Economics is partially mathematical science and partially a study in human psychology. Both financial and psychological factors affect the behavior of investors and the marketplace. For example, one popular theory known as expectations theory is based upon the hypothesis that long-term interest rates contain a prediction of future short-term interest rates. Expectations theory postulates that you would earn the same amount of interest by